Forby Road Bridge Replacement

August 12, 2019

The contractor poured the floor of the first phase of the box and will continue working on the walls and top of the box this month.  When the box and roadway work is complete, the contractor will switch Forby traffic onto the first phase of the new section to allow for completion of the remaining section of the new box culvert.

June 28, 2019

The contractor plans to start working on the first phase of the box construction again in early July, weather permitting.

June 3, 2019

The recent heavy rains have temporarily halted the progress on this project, but the contractor intends to resume the substructure work in the next few weeks as the rains will hopefully slow to a more seasonal rate.

April 29, 2019

The contractor has begun excavation work on the south side of the new box culvert.  They will be working on the new box culvert and approach roadway over the next months, as weather allows, and anticipate shifting traffic onto the south side later this Spring.  Please use caution when traveling through the area.

Project Overview

This is a project to remove and replace the existing structurally deficient box culvert located on Forby Road, just west of Spoonville Road and about 2,500 feet west of Alt Road.